STC-SMC completely redesigned and
rebuilt an existing 8 MMSCFD Nitrogen Removal Unit near Price, UT. Our
services included disassembling the existing plant, relocating it to
Bartlesville, complete checkup and testing, upgrading all instruments and
control system, installation in Utah, startup and commissioning of the plant
which produced better than anticipated results in the quality of natural gas
processed. |
Photo of a grassroots turn-key 5 MMSCFD
plant under construction at our manufacturing subsidiary, SMC. This plant
consisting of 14 modules was designed using the latest 3D modeling software
and will operate near Bowling Green KY. STC-SMC team plans to install this
plant in Kentucky and provide all services including startup and
commissioning. |

This compact dewatering unit was designed and
built by the STC-SMC team. The entire plant was designed to put inside ocean
going shipping containers for installation at our customer’s facility. We
have completed four of these plants for sites in Chile, Argentina and
Mexico.
|
Pilot
Plant module designed by STC and manufactured by SMC.
Module built and
shipped on it’s side and photo shows erection at customer’s site in less
than 24 hours.
|
|